REQUIREMENTS - MOUNTING OF MOBILE AIR-CONDITION MAC9010

Initially the plastic factory outbound control pipe was incorporated to the stack by means of convertor (fig. 3) added to the set. Having tested the appliance, fitting it to the window of a door.



The installation was carried out by short goffer metallic control pipe, diameter 14 cm in rigid double door, as according to photos. Breached was only requirement for distance of 50 cm from the air conditioning system with joinery and furniture.



According to the pattern of the guidelines, behind air conditioning system, and the right thereof have no objects of less than 50 cm. Unfortunately this requirement, at that installation is impracticable, but I don't know how to compensate the lack of distance. For the present the conditioner is lifted vertically (above air-flow obstacle) and rotated a bit.


Characteristics pointed ot the packaging:
mobile air conditioning
cooling, drying, ventilation
cooling power: 9000 BTU (2640 W)
management through touch keys or remote device
air flow 400 cubic m/hour
temperature range: 16-30°С
3 degrees of fan
24-hour timer
sleep mode
air filter with activated charcoal: washable, removable
mobile using 4 rollers and ergonomic handles for carrying
2 m plastic flexible goffer hose - diameter 14 cm
Coolant Gas R410a
Room capacity max 75 cubic meters.